Pakistan Pioneer 7700tpd Clinker Cement Project including WHRS and Power Plant

Pakistan 7700TPD Clinker Cement Production Line and supporting 12MW WHR (waste heat recovery system) and 24MW CPP (coal fired power plant).Pioneer Cement Company 7000tpd Clinker Cement Production Line with its 12MW Waste Heat Recover system and 24MW Coal-fired Power Plant project locates in Kushab, 350 km away northwest of Lahore, Pakistan. This is a project constructed by CDI on turnkey basis, and with the design capacity of 7000tpd, it can actually maintain operating capacity between 8200tpd-830