Yunnan Hongta 6000TPD cement production line
1. Project Introduction
To built a 6000TPD clinker production line with an annual production of 2.24million ton of clinker, 2.8million ton of kinds of cement on turnkey basis.
2. Project Characteristic
1) rich oxygen burning system is equipped for this project due to high altitude of 2240 meters in the main construction area where the oxygen content and air pressure is much lower.
2) CDI has developed especially for this project a low-pressure-loss and low-nitrogen precalcining system used in high altitude area for the burning system which has a higher thermal efficiency, lower systematic resistance and lower concentration of NOX initial emission.
On November 29, 2019, the Yunnan Hongta 6000 ton daily cement clinker production line project, which was contracted by CDI, was successfully ignited in one go, achieving the goal of completing the entire line one month ahead of the contract period (one year).