Jordan ARC 9MW Cement WHR EPC Project
The ARC 9MW Cement Waste Heat Power Generation System EPC Project (9000 KW GROSS Waste Heat Recovery Based POWER PLANT) is located in Jordanian capital Amman.
The project is to build a 9000KW cement pure low-temperature waste heat power generation system on the basis of the owner's original production line with a daily output of 6000 tons, for the factory's own use. The job responsibilities include design, supply, transportation, construction, commissioning, testing, performance evaluation, technical training, insurance, etc. The total contract period is 15 months.
The project successfully obtained the PAC certificate issued by the owner on December 9, 2016.