In 2023, CDI successfully implemented two photovoltaic projects in Pakistan, Sufi Oil and Sufi Soap, and successfully implemented the MINISO Lahore office building roof photovoltaic project. All adopt the EPC general contracting mode, and the projects have been successfully handed over.
CDI has accurately matched the energy needs of local enterprises Sufi Oil, Sufi Soap, and commercial institution Miniso, providing them with localized green energy solutions. This "point-to-point" project cooperation model breaks the limitations of traditional large-scale energy projects with long cycles and difficult coordination. With "small but refined" implementation results, it has become the "capillary" of China Pakistan energy cooperation, demonstrating the precise control ability of enterprises in photovoltaic applications in different scenarios.